Flex Time: Peddie’s Fitness Center Set for Multi-Million Dollar Renovation

Flex Time: Peddie’s Fitness Center Set for Multi-Million Dollar Renovation
Peddie’s fitness center is about to undergo a state-of-the-art renovation.

The school has outgrown the fitness center, which is housed within the Ian H. Graham ’50 Athletic Center. The $7.4M project will result in the Zhao Li Family Fitness & Exercise Center, complete with a range of impressive upgrades, including:

  • A redesigned fitness center for top-tier athletic conditioning and community wellness.
  • A second floor with additional cardio machines.
  • Golf simulators for year-round training.
  • An erg room for year-round rowing training.
  • A multi-purpose space for classes such as yoga and dance.
  • Upgraded HVAC systems.
  • Two elevators, allowing greater accessibility to the entire Athletic Center.
  • A flexible conference space for group and team meetings.
new Peddie Fitness Center cardio room

Planned upgrades to the fitness center include adding a second floor with additional cardio machines (above) and an erg room for year-round training (below).

Peddie Fitness Center new rowing room

Peddie alumnus and trustee Rob Ruberton ’93 acknowledged the project’s importance and the critical role athletics play in a well-rounded education. “The education I got in this building was as important to me as the education I got in the classroom. Athletics at Peddie taught me determination, perseverance, time management and sacrificing now for the future. It’s been an enormous part of my character, and I think it made me who I am.”

Head of School Peter Quinn P’15 ’18 ’21 stressed how vital the renovation will be to the community’s health and well-being. “The athletics facilities are used by over 50 teams and physical activity programs every year,” he said. “The updates to the fitness center will provide our student-athletes with the space and equipment to compete at the very highest level. I am grateful to the executive committee of the board of trustees for fast-tracking this project, which represents one of the priorities of our historic One Peddie campaign.”

With a completion date set for the first half of 2024, Peddie has already raised $6.3M for the renovation from generous alumni, alumni parents and current parents. More naming opportunities are available for individuals, families, alumni classes or groups of alumni interested in creating a legacy that supports Peddie athletics. Visit the One Peddie campaign website to learn more.